What will the Installer do during the site assessment?
The Installer will prepare a detailed report on your site for your profile and quote. They will take photos of your roof, main switchboard, garage, entry/exit points, and the location for your battery to include in the report.
Some key parts of the site visit include:
- Identify the best location for the hardware of your Kit (eg: Solar Panels, Inverter and Battery).
- Evaluate the roof and take photos
- Inspect the Main Switch Board
- Plan the cable route and wiring to connect your hardware components (eg: from the solar panels on the roof to your switchboard).
- Prepare the site access plan for your home, including planning the required equipment to access the roof and safely complete the installation.
- Discuss the plan for battery backup during a blackout (if you want this functionality).
Their report will also include if any pre-works are required prior to booking the installation.